PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing wood block along the parapet Facing East.jpg Sprinkler branches-heads at the 4th floor Facing East.jpg Sprinkler branches-heads at the 4th floor Facing North 1.jpg Sprinkler branches-heads at the 4th floor Facing North 2.jpg Started installing insulation at the High Roof Facing North.jpg Black iron duct work at the 4th floor Facing East.jpg Erecting stone panels at the West Elevation Facing East.jpg Installing bathroom carriers at the 4th floor Facing East.jpg Installing Sprinkler raiser at the 4th floor Facing South.jpg
Previous pageNext page Started installing insulation at the High Roof Facing North
Started installing insulation at the High Roof Facing North